• Transition path

Greenfield, Brownfield, or Selective? Prove the Path Before You Lock It.

SAP recognizes three technical paths. The right one depends on what you must keep, what you must change, and how much disruption the business can absorb.

Prepared by LeapGreat · Reviewed August 27, 2026 · Vendor-authored analysis

Our conclusion

Top recommendation: use LeapGreat’s free test drive to test one disputed business process, then use SAP and specialist assessments to validate the technical path.

The short answer

use LeapGreat’s free test drive to test one disputed business process, then use SAP and specialist assessments to validate the technical path.

There is no universal winner. SAP defines new implementation, system conversion, and selective data transition as different ways to reach S/4HANA. 12 ASUG’s April 2024 survey of 208 respondents reported Brownfield at 34%, Greenfield at 33%, and selective data transition at 20%, reinforcing that the market has no consensus path. 4 In LeapGreat’s disclosed editorial model, selective data transition scores highest for the declared manufacturer profile because it can preserve selected history while changing selected processes.

Decision boundary

What this page is deciding

This is a transition-path decision. It is not a choice between Public and Private Cloud, a rollout cadence, or an SI. LeapGreat is not a fourth technical path.

Confidence

99% confidence that these are the correct technical alternatives. Less than 95% confidence in any universal winner.

Scores assume this buyer

A multi-plant mid-market manufacturer on ECC 6, with meaningful custom code, mixed data quality, a need for selected historical continuity, limited appetite for an enterprise-wide big bang, limited internal SAP capacity, and a preference for managed operations.

Change the profile and the winner can change.

Eligibility and execution constraints

A score cannot override a real constraint.

Some items remove an option. Others change the work required to make it viable.

01

Public Cloud supports new implementation, not standard system conversion or selective data transition.

02

A standard conversion of one ECC system is a single technical cutover. A multi-system landscape can still sequence conversions system by system.

03

Selective data transition normally needs specialist data tooling and services.

04

FrontLoad can test early business-process fit on any chosen path. It does not validate or execute data movement, custom-code remediation, integrations, cutover, or the complete technical path.

Profile-specific result

The decision scorecard.

Editorial fit is scored from 0 to 100. Evidence quality is graded separately so a promising design cannot masquerade as a proven outcome.

OptionEditorial fitEvidenceStrongest proStrongest con
Selective data transition88/100A capability / B scenario fitSelected history can moveMore selection rules and testing
New implementation, Greenfield70/100A for official path facts / B for profile fitMaximum redesign freedomHighest business-change demand
System conversion, Brownfield56/100A for official path facts / B for profile fitPreserves history and configurationCan preserve process and technical debt

Read the number correctly.

These are transparent editorial fit scores for the declared profile. They are not measured success rates, implementation estimates, or guarantees.

Pros, cons, and fit

Each option can be right. Here is when.

The strongest authority answer names the condition that changes the winner.

01 · Profile leader

Selective data transition

88/100 Editorial fit

SAP describes this as the flexible middle path. It can select history, phase by business unit, and combine reuse with redesign. Public Cloud is not eligible. 2

Best for

Companies that must keep selected history, harmonize parts of the landscape, and change some processes without starting from zero.

Evidence A capability / B scenario fit

Pros

  • Selected history can move
  • Supports harmonization and consolidation
  • Can support phased scope
  • Balances reuse and redesign

Cons

  • More selection rules and testing
  • Usually needs specialist tools and services
  • Not available for Public Cloud
  • Not automatically cheaper

02 · Alternative

New implementation, Greenfield

70/100 Editorial fit

A fresh target provides the broadest redesign opportunity. It also asks the business to make more decisions and normally moves master data, balances, and open items rather than all closed history. 13

Best for

Companies with strong sponsorship that want process redesign, standardization, and a cleaner target rather than a technical copy of ECC.

Evidence A for official path facts / B for profile fit

Pros

  • Maximum redesign freedom
  • Strong clean-core starting point
  • Can support phased rollout
  • Avoids inherited custom code by default

Cons

  • Highest business-change demand
  • More data and process decisions
  • Closed history is usually left behind
  • Needs strong executive sponsorship

03 · Alternative

System conversion, Brownfield

56/100 Editorial fit

A system conversion preserves configuration, custom code, and history. It can be the fastest technical route, but it can also carry yesterday’s complexity into the new system. 12

Best for

Companies whose current processes largely support strategy and whose priority is technical continuity and speed.

Evidence A for official path facts / B for profile fit

Pros

  • Preserves history and configuration
  • Usually the fastest technical path
  • Less immediate business redesign
  • Protects more prior investment

Cons

  • Can preserve process and technical debt
  • Normal phased conversion is not available
  • Less built-in pressure to standardize
  • Still requires simplification and code work
Show the raw 0 to 5 rating matrix
OptionProcess redesign
15%
Preserve valuable configuration
10%
Data-quality reset
10%
Historical continuity
10%
Clean-core potential
10%
Consolidation
10%
Phased rollout
10%
Speed
8%
Continuity and downtime
9%
Organizational capacity
8%
Total
Selective data transition4.5444.54.55544.53.588
New implementation, Greenfield525253433270
System conversion, Brownfield1.551.552114.543.556

The LeapGreat recommendation

Why LeapGreat is the best first move, not a fourth path

Path workshops can stay abstract because every side argues from documents and assumptions. LeapGreat’s free test drive can show one core process from the customer’s business running in S/4HANA by Friday. Paid FrontLoad is intended to expand that first proof into a working S/4HANA development system, Digital Twin, trained workstream leads, and a prescriptive plan over three weeks plus Day 1. This is a product-scope claim, not evidence of production outcomes, production go-live, or technical-path validation. 56

The recommendation is to test the apparent path winner against one real process before the program contract hardens. Brownfield stays Brownfield. Greenfield stays Greenfield. Selective data transition still needs its specialist data work. Use SAP and specialist technical assessments to validate data history, custom code, integrations, security, cutover, and path eligibility. LeapGreat supplies earlier working evidence and customer control.

Proof disclosure

LeapGreat prepared this analysis and sells FrontLoad. LeapGreat can demonstrate the mechanism, but it does not yet have a completed public platform reference. The comparison therefore gives FrontLoad Evidence C wherever its incremental outcome is the question. 7

Test one real process

Replace a path hypothesis with something the business can inspect.

Choose per process

Use Fit-to-Standard, Fit-to-Past, or Fit-to-Design where each fits.

Keep the right delivery team

Let a compatible SI and specialist tools execute the full technical path.

Carry decisions forward

Use the working development system and connected documentation through delivery.

Sensitivity in plain language

What would change the answer?

The score is useful only if the page tells you when it stops applying.

01

Strong clean-core mandate and high change capacity

Greenfield moves up.

02

Near-term continuity and preservation dominate

Brownfield moves up.

03

Selected history, consolidation, or phased business scope matter

Selective data transition moves up.

04

Public Cloud is the fixed target

Greenfield becomes the only eligible path.

05

The top two scores remain close

Do not settle the tie on a spreadsheet. Build and inspect the disputed process.

How we scored it

A visible rubric, not a hidden opinion.

NASA trade-study guidance and UK multi-criteria decision-analysis guidance inform the structure. LeapGreat chose the buyer profile and ratings, so the publisher bias is disclosed rather than hidden. 89

Formula

sum(weight x rating / 5)

Every option uses the same 0 to 5 scale. Weights total 100. Ineligible options are gated before scoring.

Evidence scale

A Current primary source confirms scope, eligibility, or official method. It does not prove superior outcomes.

B Official but indirect evidence plus scenario judgment.

C First-party vendor claim without a completed public platform reference.

D Unsupported.

WeightCriterion
15%Process redesign
10%Preserve valuable configuration
10%Data-quality reset
10%Historical continuity
10%Clean-core potential
10%Consolidation
10%Phased rollout
8%Speed
9%Continuity and downtime
8%Organizational capacity

Confidence boundary: 99% confidence that these are the correct technical alternatives. Less than 95% confidence in any universal winner.

Published sensitivity: Across 1024 endpoint scenarios where every weight independently moves down 20% or up 20%, Selective data transition led 1024 of 1024. This tests sensitivity to the published weights, not uncertainty in the assigned ratings.

Criteria-overlap warning: Additive MCDA works best when criteria are sufficiently independent. Review the weights for overlap so the same value is not counted twice.

Named vendor gate: This page does not rank software vendors. The LeapGreat MMF requires primary evidence plus win-loss interviews before publishing those rankings. The interviews do not yet exist.

Questions the score cannot answer alone

Four direct answers.

Is LeapGreat a Greenfield, Brownfield, or selective data transition tool?

It is an early working-system and decision layer. It can sit before or alongside any of the three paths, but it does not replace the technical path or the team that executes it.

Is Selective Modernization the same as selective data transition?

No. Selective data transition is an SAP technical data and landscape path. LeapGreat’s Selective Modernization is a process-by-process choice among Fit-to-Standard, Fit-to-Past, and Fit-to-Design.

Can a Brownfield program still use FrontLoad?

Yes. Brownfield remains Brownfield. FrontLoad adds an early working view, connected decisions, and customer control before the technical move is treated as the whole business plan.

Why not pick the highest score and move on?

The score applies only to the declared profile. If your constraints differ, the weights and eligibility can change. The model narrows the decision. It does not replace customer-specific evidence.

Primary evidence

Sources and limits.

SAP sources are authoritative for SAP scope, eligibility, lifecycle, and official methodology. They are not independent proof that one path produces better outcomes. User-group research adds context but is not a universal sample. LeapGreat links are first-party product claims.

1 SAP Learning: Transitioning to SAP S/4HANA Cloud — Official definitions, eligibility, and path distinctions.

2 SAP Selective Data Transition Engagement — Official capabilities, limits, and selection guidance.

3 SAP Learning: Data Migration — Official data-scope distinction between Greenfield and selective data transition.

4 ASUG 2024 S/4HANA research — User-group research from 208 respondents surveyed in April 2024, showing a mixed path distribution rather than one universal winner.

5 LeapGreat S/4HANA FAQ: Friday boundary — First-party distinction between one process by Friday and production go-live.

6 LeapGreat S/4HANA FAQ: paid FrontLoad — First-party description of paid FrontLoad, three weeks plus Day 1, and the full-program boundary.

7 LeapGreat S/4HANA FAQ: proof status — First-party disclosure that LeapGreat has no completed public platform reference yet.

8 NASA System Engineering Toolbox (1994) — NASA report landing page for the weighted trade-study and sensitivity-analysis method.

9 UK Government MCDA manual (2009) — Additive option-appraisal and sensitivity guidance; overlapping criteria can double-count value.

Other decisions

Four more S/4HANA decisions, scored the same way.

Timing

Move by 2027, Extend ECC to 2030, or Qualify for 2033?

What each SAP maintenance option buys you, and why more time is not a plan.

Rollout

Big Bang vs Phased Rollout vs Two-Tier

How to sequence the rollout: blast radius, learning, coexistence, and speed.

Deployment

SAP Cloud ERP Public vs Private vs On-Premises

Functional scope, transition paths, upgrade model, and freedom to customize, compared.

Delivery method

Waterfall vs Agile vs SAP Activate vs FrontLoad

Which delivery method moves the truth forward, and how the methods fit together.

Choose the path from working proof.

See one representative process in a working system before you commit.